Half of the US-AUP magnet production at CERN

 cylindrical red piece of equipment with four white logos on it

Figure 1. US-AUP quadrupole delivered recently to CERN. Cecile Noels / CERN

By Susana Izquierdo Bermúdez (CERN)

At the end of October we received two more magnets from Fermilab (CA03 and CA05). With these deliveries, half of the units from the US are at CERN! They join the other three magnets already received: CA01 and CA02 for the IT String, and CA04.

After the testing of CA04 at CERN and CA03 at Fermilab confirming they are both conform, the first Q1 and Q3 magnets (the first and fourth quadrupoles from the interaction point of the new inner triplet of the HL-LHC) are qualified for installation.

truck with red carrier part, and cylindrical red equipment with four white logos on it

Figure 2. The most recent two deliveries of magnets from the US-AUP mean that half of the magnets from this collaboration are now at CERN. Photos: Giorgio Apollinari / FNAL (left); Cecile Noels / CERN (right)

Related photo collections

Delivery of firstsecond and third US-AUP magnets to CERN

Deliveries kicking off 2025